Laboratory Construction Project Overview

With the rapid development of various electronic and electrical industries, the demand for testing laboratories is also growing day by day. To meet market needs, building testing laboratories that comply with national standards and industry specifications is an important measure to improve the quality of electronic and electrical products and safeguard public health. In laboratory construction, rational design and appropriate layout can ensure the good operation of the laboratory and improve the efficiency of inspection work. Through the refinement of multiple laboratory construction projects and continuous investment in human resources, our company has continuously developed and improved in the design of testing laboratories, forming a standardized laboratory construction system. We provide customers with professional laboratory zoning, testing equipment that meets customer needs, and complete the construction of testing institutions.

Laboratory Construction Content Planning

1. Physical Performance Testing Lab Physical technical index requirements that various electronic products must meet.
2. Electrical Safety Testing Lab Electrical safety is primarily implemented according to international/domestic standards.
3. Environmental Reliability Lab Verify the reliability performance of equipment under various environments.
4. Electromagnetic Compatibility Lab Testing requirements for electromagnetic compatibility of various equipment.

Construction of Laboratories with Different Testing Functions According to Standards, and Functional Zoning Construction

1. Sample Room
2. Rectification Room
3. Physical Performance Testing Lab
4. Electrical Safety Testing Lab
5. Environmental Reliability Lab
6. Mechanical Reliability Lab
7. IP Rating Lab
8. Electromagnetic Compatibility Lab
Laboratory Design Planning

Laboratory Construction Service Content

As a professional team focused on the field of laboratory construction, we have deep accumulation in laboratory equipment performance research and assurance, meticulous circuit system layout design, and fire safety management. By organically combining professional knowledge with rich practical experience, we are committed to creating integrated solutions for laboratory equipment configuration, power supply, and fire protection that are high-performance, safe, and reliable.

Electromagnetic Compatibility EMC

RE CE RI BCI ESD CI CS EFT SURGE H&F ESD PMS

Safety Lab

Electrical Performance Test Electric Shock Protection Mechanical Protection Radiation Protection Overtemperature Protection

Environmental Reliability

Climatic Environment Test Mechanical Environment Test Comprehensive Environment Test

Application Fields

Consumer
Automotive
Wireless
Information Equipment
Medical Products
Semiconductor Chips
Laboratory Design Planning

Laboratory Construction Service Process

Nine-Step Strategy for One-Stop Laboratory Solutions

1

Laboratory Construction Preparation

The first step of the overall laboratory solution is also the most important one, determining whether the laboratory is constructed smoothly. Laboratory construction preparation includes site selection requirements, determination of testing items and methods, prediction of testing frequency, and setting of laboratory planning years.

The laboratory site must ensure that the environment does not interfere with testing, such as vibration, load-bearing, and floor height. Determining testing items and methods in advance is to arrange laboratory functional rooms more reasonably, ensure smooth laboratory operation, and reduce mutual interference between equipment. Predicting testing frequency is mainly to calculate the laboratory's electricity, water, and other loads, which can predict laboratory energy consumption in advance and better arrange the laboratory's electricity, water supply and drainage, ventilation, etc. Setting the laboratory planning years determines the specifications of decoration materials to be used, reducing the laboratory decoration budget.

2

Laboratory Design Planning

Based on the actual situation of the customer's laboratory and the experimental projects to be carried out, we tailor design for customers: laboratory floor plan, laboratory furniture layout diagram, instrument and equipment placement diagram, laboratory decoration design drawing, laboratory water supply and drainage design drawing, laboratory HVAC design drawing (exhaust, exhaust gas treatment, air conditioning and purification system), laboratory centralized gas supply design drawing, laboratory sewage system design drawing, laboratory electrical design drawing, laboratory intelligence and automation design drawing, etc.

Key considerations for laboratory layout: arrange according to actual testing project requirements and local conditions, fully considering the convenience, safety, and scalability of laboratory work. Ensure that the laboratory design planning meets both legal and regulatory requirements and the personalized needs of customers.

3

Laboratory Renovation Construction

Based on relevant laboratory construction standards and combined with the requirements of the testing projects conducted by the customer, a professional laboratory decoration team provides customers with new construction, renovation, expansion and other decoration services, including: laboratory main structure construction, laboratory electrical construction, laboratory ventilation system construction, laboratory clean system construction, laboratory waste gas and sewage treatment facility construction, etc.

The core of laboratory renovation construction: realizing the design plan.

Lvce Technology proposes performance requirements for decoration materials and recommends material types and specifications. Based on the project quantity and decoration material brand, specification, and unit price, the price of the decoration project is formulated.

4

Laboratory On-site Supervision

Purpose of laboratory on-site supervision: ensure that the construction process is strictly implemented according to the construction plan.

Lvce Technology is responsible for following up on laboratory decoration construction, timely discovering problems existing at the laboratory construction site, and ensuring that laboratory construction meets the requirements of the construction plan.

5

Laboratory Project Acceptance

Purpose of laboratory project acceptance: assist the owner in accepting the laboratory to ensure that the laboratory's functions, layout, materials, etc. meet the design requirements.

Since there are many concealed works during construction, it is difficult to discover some defects in a short time after the completion of laboratory decoration construction. Therefore, when compiling the design plan, Lvce Technology sets such issues as stage acceptance nodes to avoid quality control failures due to missing key quality control points.

Establish acceptance criteria for laboratories in different fields based on standards, and conduct comprehensive acceptance from aspects such as laboratory standardization, safety, and reliability to ensure that the laboratory meets the requirements of safety, environmental protection, and relevant accreditation and certification standards.

6

Laboratory Equipment Procurement Consulting

Provide consultation and assistance for configuring testing systems that meet testing requirements for the laboratory.

Through years of cooperation with instrument and equipment manufacturers and agents, Lvce Technology can compare equipment used by other existing third-party laboratories to ensure that customers select the most cost-effective equipment.

7

Laboratory Personnel Recruitment and Training

Provide the following training services (provided by Lvce strategic partners, including but not limited to):

Laboratory Accreditation Specification Training / Qualification Accreditation Specification Training / Laboratory Management Improvement Training / 17025 Internal Auditor Training / Measurement Uncertainty Assessment and Expression Training / Test Result Quality Control Training / Laboratory Safety Training

8

Laboratory Operation Management

Provide the following laboratory operation management services (services provided by Lvce Technology strategic partners):

Laboratory Commissioned Management Service / Laboratory Technical Service Consulting / Laboratory Equipment Calibration Service / Laboratory Instrument and Equipment Procurement Agency
Instrument Maintenance and Servicing Service / Laboratory Consumables Procurement / Proficiency Testing Provision / Certified Reference Material Provision / Laboratory CMA Qualification Accreditation or CNAS Accreditation Consulting

9

Laboratory Accreditation Consulting

CNAS is the national accreditation body established and authorized by the Certification and Accreditation Administration of the People's Republic of China, responsible for the accreditation of certification bodies, laboratories, and inspection institutions.

Lvce Technology's strategic partners have many years of laboratory technical experience, and most hold CNAS assessor qualification certificates. They can conduct inter-laboratory comparisons among more than 150 laboratories in various fields across the country, ensuring that your laboratory can pass CNAS accreditation/CMA qualification accreditation in one go.

Explore Sales, Technical & Solution Resources?

Contact Us
Tel: 020-2204 2442
E-mail:Sales@greentest.com.cn
微信客服二维码